Water service restored after residents block Guerrero highway

Residents of three neighborhoods in Atoyac de Álvarez, Guerrero, had gone without running water for almost two months. Yesterday, the service was reestablished but not until the angry citizens shut down traffic on the highway that connects the resort destinations of Acapulco and Zihuatanejo.

About 100 protesters set up an intermittent roadblock on federal highway 200 and demanded a meeting with Mayor Dámaso Pérez Organes.

A spokesman told reporters that water service had been cut off almost two months ago but the municipal water utility, Capasma, continued to charge for it.

Simón Ríos Suárez explained that the municipality was in arrears with the Federal Electricity Commission (CFE), which in response had shut down the distribution system.

Protesters met with the mayor at noon and later participated in negotiations between the mayor and CFE representatives.

The roadblock was lifted about 4:00pm after the municipality reached a settlement with the electricity commission.

Source: Síntesis de Guerrero (sp)

Have something to say? Paid Subscribers get all access to make & read comments.
Tamul Waterfall dried up

Why did the Huasteca Potosina’s picturesque Tamul Waterfall dry up?

0
State and federal authorities pulled out all the stops to get the Gallinas River flowing again to the waterfall site, including a total ban on upstream extraction for irrigation, but to no avail.

The MND Peso Index™: Is the Mexican peso over or undervalued against the US dollar?

8
The MND Peso Index™ is a new monthly economic indicator developed by Mexico News Daily that measures whether the Mexican peso is overvalued or undervalued against the US dollar.
The Mayab Highway connecting Mérida and Playa del Carmen

Mexico Infrastructure Partners announces plan to invest US $12B across key sectors

1
Bloomberg reported that around $8 billion of the firm's planned investment would go to renewable energy projects, some $2.5 billion would go to highway projects, $1 billion to midstream opportunities and $500 million to digital infrastructure.
BETA Version - Powered by Perplexity