Sunday, January 18, 2026

70 Metro escalators out of service for inspections

Malfunctions by two escalators in the Mexico City subway system injured at least 10 people over the last month, prompting the city government to shut down over 70 so they can be inspected.

The injuries occurred after mechanical problems caused them to stop suddenly.

Yesterday, the transit operator said 90 escalators in 12 stations are being checked, and that while 16 of those are now fully operational the remainder will be shut down until they are deemed safe to operate, a process that could take until next week.

Line 7 is the most affected, with escalators in 10 of its 14 stations not operating. Two more stations are affected on Lines 3 and 8.

Metro officials said the mechanical malfunctions were due to the age of the escalators and a lack of maintenance.

The Mexico City Metro has about 468 escalators, which the manufacturer says should last for about 25 years. One of the escalators that malfunctioned was installed 33 years ago.

Source: Milenio (sp)

Have something to say? Paid Subscribers get all access to make & read comments.
A man walks in front of a faded mural of the silhouette of President Claudia Sheinbaum, on Emiliano Zapata Street in Mexico City.

Mexico’s week in review: Sovereignty debate reaches boiling point as Trump ramps up pressure on cartels

3
The week of Jan. 12 commenced with high-stakes diplomacy over Trump's military threats and concluded with intensifying prospects of U.S. intervention, bookending days of showcased cartel arrests and security achievements.
SAT building

More aggressive audits made 2025 a record year for tax collection in Mexico

3
Experts attribute 2025's record tax collection to the SAT’s new auditing strategy, which relies on artificial intelligence to carry out more comprehensive electronic audits.
An aerial view of an under-construction bridge leading to the thin peninsula that is Cancún's hotel zone

Transportation Ministry will reinforce Cancún’s nearly-complete Nichupté Bridge after photos show cracks

0
Federal transportation officials say structure poses no risk but will add support pillars and conduct load tests before the bridge's inauguration.
BETA Version - Powered by Perplexity