‘A new Tenochtitlán:’ park at site of abandoned airport will cost 17 billion pesos

A huge ecological park to be developed on and around the site of the abandoned Mexico City airport project will cost just over 17.7 billion pesos (US $808.7 million), the National Water Commission (Conagua) has determined.

According to an investment proposal recently submitted to the Ministry of Finance, development of the 12,225-hectare Lake Texcoco Ecological Park (PELT) will begin in 2021 and finish in 2028.

Conagua said the outlay during the current government’s six-year term (2018-24) will be just over 10.9 billion pesos with a first installment of 2.9 billion pesos to be allocated to the project next year.

The water commission also calculated that the operation and maintenance of the park, which will be divided into four different zones, will cost just over 13 billion pesos during a period of 31 years.

The total cost of the project will therefore be at least 30.77 billion pesos (US $1.4 billion).

Referring to the grandeur of the project and its waterways, President López Obrador said earlier this month that the ecological park will be like a “new Tenochtitlán,” the water-rich capital of the Aztec empire that once stood on the land where Mexico City is now located.

Iñaki Echeverría, an urbanist and architect who designed the PELT, said last week that one area of the park will be opened to the public in 2021.

The ancient lakebed site of the abandoned airport, a US $13-billion project that was canceled by López Obrador after a controversial public vote before he took office, will be part of the PELT’s 4,875-hectare Zone II.

The zone, much of which will be reforested, will feature three different parks with gardens, public spaces, walking paths, sporting facilities and parking lots, according to a cost-benefit analysis.

Across the PELT’s four different zones, a total of eight separate parks are slated for development. Zone I will encompass six restored lakes and lagoons including Lake Nabor Carillo while Zone III will include three more lagoons.

Zones III and IV will set aside land for agricultural purposes and a solar farm is slated to be built in the former.

The government expects that the PELT, which will dwarf Mexico City’s 678-hectare Chapultepec Park, will lead to a reduction of respiratory illnesses among local residents and generate a range of other environmental benefits including improved regulation of water resources.

It also expects that the project will add value to real estate in six México state municipalities and two nearby boroughs of Mexico City.

Conagua said the PELT will “promote inclusion and social cohesion” in the surrounding areas and “generate identity and pride” among people who live in the eastern region of the Valley of México.

Echeverría orginally designed the Lake Texcoco Ecological Park in 2010 but the project was sidelined four years later by former president Enrique Peña Nieto’s plan to build a new airport on land located about 25 kilometers northeast of central Mexico City.

Source: Reforma (sp) 

Have something to say? Paid Subscribers get all access to make & read comments.
On Sunday, President Claudia Sheinbaum led a rally at the Monument to the Revolution in honor of the second anniversary of her election in 2024.

Mexico’s week in review: Sheinbaum pushes back on US pressure as World Cup nears

0
Against the backdrop of festive preparations for the 2026 FIFA World Cup, the first week of June proved to be one of the most charged of Claudia Sheinbaum's presidency. Here's what happened in Mexico from June 1 to June 5.
NWS fly

Screwworm parasite arrives at the US border, with new cases in Coahuila and Texas

0
The flesh-eating parasite has now been confirmed from southern Mexico all the way to Texas, with human cases reported in multiple Mexican states.
An aerial view of Azteca Stadium, re-labelled Mexico City Stadium ahead of the 2026 FIFA World Cup

Everyone working the World Cup needs a FIFA badge — even the pizza lady

1
MND's Peter Davies reports from the FIFA accreditation line, where an army of vendors, journalists and other stadium workers are preparing for the biggest sporting event of the year.
BETA Version - Powered by Perplexity